Advanced Autopilot Facility
Heavy-duty industrial plant equipped with quantum control cores and precision optics for high-fidelity sensor integration. Reinforced frames support the increased complexity and speed of mass-producing advanced autopilot cores.
productionTier 3 of 4advanced_autopilot_facility
Stats
CategoryProduction
Level3
Build Cost7,473,000 cr
Build Time300 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Flight Control Assembly | 853,000 | 150 | 10 | 1 | 1 | 5 |
| L2 | Autonomous Flight Systems | 2,450,000 | 230 | 20 | 2 | 1 | 6 |
| L3 | Advanced Autopilot Facilitythis tier | 7,473,000 | 300 | 35 | 4 | 1 | 7 |
| L4 | Autonomous Control Engineering Hub | 22,157,000 | 380 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.