Advanced Cryogenic Fabrication
A state-of-the-art facility with quantum control cores orchestrating every assembly stage, from component machining to final hermetic sealing. Thousands of precision optics and processing cores work in concert for maximum throughput and zero thermal degradation.
productionTier 4 of 4advanced_cryogenic_fabrication
Stats
CategoryProduction
Level4
Build Cost3,201,000 cr
Build Time420 ticks
Labor Cost25
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cryogenic Assembly Line | 114,000 | 170 | 5 | 1 | 1 | 3 |
| L2 | Industrial Cryogenic Plant | 365,000 | 250 | 10 | 2 | 1 | 6 |
| L3 | Automated Cryogenic Works | 988,000 | 330 | 18 | 4 | 1 | 7 |
| L4 | Advanced Cryogenic Fabricationthis tier | 3,201,000 | 420 | 25 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.