Advanced EM Charge Manufacturing
State-of-the-art facility with precision quantum control and extensive coolant circulation for superconductor stability. Fully automated targeting computer networks and weapon housing assembly deliver consistent, high-volume EM charge production.
productionTier 4 of 4advanced_em_charge_manufacturing
Stats
CategoryProduction
Level4
Build Cost3,559,000 cr
Build Time420 ticks
Labor Cost40
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | EM Charge Press | 128,000 | 100 | 7 | 1 | 1 | 3 |
| L2 | Automated EM Charge Plant | 373,000 | 250 | 16 | 2 | 1 | 6 |
| L3 | Industrial EM Charge Manufacturing | 1,298,000 | 330 | 28 | 4 | 1 | 7 |
| L4 | Advanced EM Charge Manufacturingthis tier | 3,559,000 | 420 | 40 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.