Advanced Frame Assembly Plant
A larger facility with expanded bonding chambers and improved coolant management for handling the thermal stress of composite material fusion. Produces reinforced frames at higher throughput for demanding production environments.
productionTier 2 of 4advanced_frame_assembly_plant
Stats
CategoryProduction
Level2
Build Cost391,000 cr
Build Time250 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Assemble Reinforced FrameFacility Construction
19.8 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Reinforced Frame Fabrication Line | 136,000 | 170 | 8 | 1 | 1 | 3 |
| L2 | Advanced Frame Assembly Plantthis tier | 391,000 | 250 | 16 | 2 | 1 | 5 |
| L3 | Heavy-Duty Frame Manufacturing | 1,188,000 | 330 | 28 | 4 | 1 | 5 |
| L4 | Reinforced Frame Synthesis Center | 3,788,000 | 420 | 40 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.