Advanced Mining Module Line
A specialized production facility assembling strip-miner-I base units with additional focused crystals, neutronium ingots, and stabilized-exotic materials for mega-scale extraction. Handles the complex layering of extraction-optimization subsystems.
productionTier 1 of 4advanced_mining_module_line
Stats
CategoryProduction
Level1
Build Cost1,765,000 cr
Build Time170 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Advanced Mining Module Linethis tier | 1,765,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Mega-Miner Manufacturing Plant | 5,438,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Industrial Strip Miner Works | 16,529,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Mega-Miner Production Complex | 48,272,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.