Advanced Passenger Cabin Production
State-of-the-art facility with quantum-controlled alignment systems, distributed processing cores, and precision optic inspection throughout. Reinforced infrastructure and advanced material handling achieve 33-second cabin cycles.
productionTier 4 of 4advanced_passenger_cabin_production
Stats
CategoryProduction
Level4
Build Cost12,629,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Modular Cabin Assembly Line | 484,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Automated Passenger Module Plant | 1,325,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Industrial Cabin Manufacturing Complex | 4,049,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Advanced Passenger Cabin Productionthis tier | 12,629,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.