Advanced Reactor Assembly
Expanded facility with modular bulkhead integration and reinforced-frame pre-fabrication, substantially reducing assembly time while maintaining docking interface tolerances.
productionTier 2 of 4advanced_reactor_assembly
Stats
CategoryProduction
Level2
Build Cost2,498,000 cr
Build Time250 ticks
Labor Cost80
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Build Station Reactor CoreShipbuilding
120 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Reactor Core Production Line | 806,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Advanced Reactor Assemblythis tier | 2,498,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Station Power Core Fabrication | 6,972,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Megareactor Production Facility | 22,385,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.