Aerogel Production Plant
Upgraded facility with enhanced thermal and pressure controls, accelerating the delicate spinning process through advanced plasma and heat-sink regulation.
productionTier 2 of 4aerogel_production_plant
Stats
CategoryProduction
Level2
Build Cost365,000 cr
Build Time250 ticks
Labor Cost10
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Aerogel Spinning Station | 104,000 | 170 | 5 | 1 | 1 | 3 |
| L2 | Aerogel Production Plantthis tier | 365,000 | 250 | 10 | 2 | 1 | 6 |
| L3 | High-Capacity Aerogel Mill | 1,092,000 | 330 | 18 | 4 | 1 | 7 |
| L4 | Aerogel Manufacturing Hub | 3,355,000 | 420 | 25 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.