Assembly Bay for Compact Argon Purifier
Argon purifiers are built up by hand here, processing cores set into the fractionating column and control nodes wired to hold the few degrees that separate argon from oxygen.
productionTier 1 of 4assembly_bay_for_compact_argon_purifier
Stats
CategoryProduction
Level1
Build Cost586,267 cr
Build Time150 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Assembly Bay for Compact Argon Purifierthis tier | 586,267 | 150 | 10 | 1 | 1 | 5 |
| L2 | Fabrication Plant for Compact Argon Purifier | 1,644,000 | 240 | 18 | 2 | 1 | 6 |
| L3 | Integration Works for Compact Argon Purifier | 5,184,733 | 330 | 32 | 4 | 1 | 7 |
| L4 | Outfitting Manufactory for Compact Argon Purifier | 14,718,867 | 420 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.