Astrogation Core Assembly
Specialized production line combining processing cores and sensor arrays with circuit boards and focused crystals into astrogation computers. Control nodes manage the precise integration required for hyperspace calculations.
productionTier 1 of 4astrogation_core_assembly
Stats
CategoryProduction
Level1
Build Cost615,000 cr
Build Time160 ticks
Labor Cost11
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Astrogation Core Assemblythis tier | 615,000 | 160 | 11 | 1 | 1 | 5 |
| L2 | Pathfinding Systems Lab | 1,778,000 | 250 | 22 | 2 | 1 | 6 |
| L3 | Astrogation Manufacturing Center | 5,575,000 | 330 | 39 | 4 | 1 | 7 |
| L4 | Autonomous Navigation Complex | 16,635,000 | 410 | 55 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.