Atmospheric Production Complex
Industrial-scale pressurization and air-handling with heavy coolant circulation and redundant control systems. Processes neon ionization and argon purification in parallel assembly streams.
productionTier 3 of 4atmospheric_production_complex
Stats
CategoryProduction
Level3
Build Cost997,000 cr
Build Time330 ticks
Labor Cost24
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Assemble Atmospheric UnitFacility Construction
9.9 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Atmospheric Assembly Line | 122,000 | 170 | 7 | 1 | 1 | 3 |
| L2 | Pressurization Plant | 363,000 | 250 | 14 | 2 | 1 | 5 |
| L3 | Atmospheric Production Complexthis tier | 997,000 | 330 | 24 | 4 | 1 | 5 |
| L4 | Integrated Atmospheric Works | 3,187,000 | 420 | 35 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.