Automated Stellar Harvester Works
State-of-the-art facility with continuous-flow production and real-time spectral calibration systems. Quantum-controlled precision optics and redundant docking infrastructure enable near-continuous output of fully certified collector arrays.
productionTier 4 of 4automated_stellar_harvester_works
Stats
CategoryProduction
Level4
Build Cost10,826,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Photonic Assembly Line | 426,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Solar Array Manufacturing Plant | 1,171,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Photonic Production Facility | 3,559,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Automated Stellar Harvester Worksthis tier | 10,826,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.