Barrier Manufacturing
Quantum-controlled assembly with active coolant circulation to maintain crystal lattice integrity during superconductor bonding, achieving microsecond-level precision at high volume.
productionTier 3 of 4barrier_manufacturing
Stats
CategoryProduction
Level3
Build Cost2,877,000 cr
Build Time260 ticks
Labor Cost32
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Shield Emitter Production Line | 345,000 | 130 | 9 | 1 | 1 | 7 |
| L2 | Field Fabrication Lab | 879,000 | 200 | 18 | 2 | 1 | 6 |
| L3 | Barrier Manufacturingthis tier | 2,877,000 | 260 | 32 | 4 | 1 | 7 |
| L4 | Void Shaper Facility | 8,409,000 | 330 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.