Bespoke Dining Hall Production Facility
State-of-the-art facility with quantum-controlled alignment, distributed processing cores, and precision optic inspection throughout. Reinforced infrastructure and advanced material handling achieve 33-second dining-deck cycles.
productionTier 4 of 4bespoke_dining_hall_production_facility
Stats
CategoryProduction
Level4
Build Cost33,100,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Dining Hall Fabrication Unit | 1,360,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Automated Banquet Assembly Plant | 3,920,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Grand Dining Manufacturing Complex | 11,400,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Bespoke Dining Hall Production Facilitythis tier | 33,100,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.