Bulkhead Framing Station
Specialized assembly facility that laminates hull plating with armor plate and titanium alloy to create heavy structural frames capable of distributing stress across multiple hull sections. Steel and copper components form the basic framework for load-bearing assembly.
productionTier 1 of 4bulkhead_framing_station
Stats
CategoryProduction
Level1
Build Cost203,000 cr
Build Time170 ticks
Labor Cost18
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Forge Reinforced BulkheadShipbuilding
27 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Bulkhead Framing Stationthis tier | 203,000 | 170 | 18 | 1 | 1 | 6 |
| L2 | Reinforced Bulkhead Plant | 527,000 | 250 | 36 | 2 | 1 | 6 |
| L3 | Bulkhead Manufacturing Works | 1,626,000 | 330 | 63 | 4 | 1 | 7 |
| L4 | Reinforced Bulkhead Fabrication Complex | 4,799,000 | 420 | 90 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.