Capital Cargo Shielding Complex
State-of-the-art automated plant with four times the coolant-loop capacity, enabling rapid titanium bonding and multi-layer lead sealing without compromise. Reinforced structural backbone supports simultaneous processing of multiple cargo bays.
productionTier 4 of 4capital_cargo_shielding_complex
Stats
CategoryProduction
Level4
Build Cost7,105,000 cr
Build Time445 ticks
Labor Cost62
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Heavy Cargo Fab | 250,000 | 175 | 13 | 1 | 1 | 4 |
| L2 | Mk.II Cargo Shielding Facility | 775,000 | 255 | 26 | 2 | 1 | 5 |
| L3 | Industrial Cargo Shielding Plant | 2,272,000 | 340 | 44 | 4 | 1 | 5 |
| L4 | Capital Cargo Shielding Complexthis tier | 7,105,000 | 445 | 62 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.