Capital Cryo-Fabrication Megaworks
Fully automated, state-of-the-art facility with redundant quantum control cores and precision optics for maximum capital-module throughput. Advanced cryo-systems and superconductor integration achieve near-continuous production cycles.
productionTier 4 of 4capital_cryo_fabrication_megaworks
Stats
CategoryProduction
Level4
Build Cost40,636,000 cr
Build Time420 ticks
Labor Cost50
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Capital Cryo-Processing Line | 1,392,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Advanced Cryo-Manufacturing Plant | 4,290,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Precision Cryo-Assembly Complex | 13,243,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Capital Cryo-Fabrication Megaworksthis tier | 40,636,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.