Cargo Hold Workshop
Straightforward production line forming and bonding steel plate with flex polymer to create basic cargo expanders. Simple fixtures and manual loading stations combine with automated curing cycles.
productionTier 1 of 4cargo_hold_workshop
Stats
CategoryProduction
Level1
Build Cost98,000 cr
Build Time100 ticks
Labor Cost6
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cargo Hold Workshopthis tier | 98,000 | 100 | 6 | 1 | 1 | 3 |
| L2 | Capacity Enhancement Facility | 296,000 | 140 | 12 | 2 | 1 | 6 |
| L3 | Bulk Storage Manufacturing Hub | 800,000 | 190 | 21 | 4 | 1 | 7 |
| L4 | Volumetric Optimization Nexus | 2,521,000 | 240 | 30 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.