Chassis Assembly Line
Higher-capacity facility with parallel assembly stations and automated material handling, significantly reducing cycle time through streamlined component integration.
productionTier 2 of 4chassis_assembly_line
Stats
CategoryProduction
Level2
Build Cost451,000 cr
Build Time240 ticks
Labor Cost22
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Frame Jig | 134,000 | 160 | 11 | 1 | 1 | 3 |
| L2 | Chassis Assembly Linethis tier | 451,000 | 240 | 22 | 2 | 1 | 6 |
| L3 | Drone Production Facility | 1,175,000 | 320 | 39 | 4 | 1 | 7 |
| L4 | Advanced Airframe Factory | 3,582,000 | 410 | 55 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.