Composite Lay-Up Plant
Batch benches braid each structure over its frame, sensor arrays calibrated to find the voids in a lay-up that would crack under maneuvering load.
productionTier 2 of 4composite_lay_up_plant
Stats
CategoryProduction
Level2
Build Cost606,400 cr
Build Time150 ticks
Labor Cost15
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Weaving Bench | 216,067 | 100 | 8 | 1 | 1 | 5 |
| L2 | Composite Lay-Up Plantthis tier | 606,400 | 150 | 15 | 2 | 1 | 6 |
| L3 | Nanofiber Composite Fabrication Complex | 2,017,067 | 220 | 28 | 4 | 1 | 7 |
| L4 | Automated Nanofiber Works | 5,513,667 | 300 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.