Cryo Compression Assembly Line
Precision assembly operation for integrating ion solutions, purified krypton, and power cells into advanced harvester units. Sensor arrays and processing cores optimized for industrial-scale gas collection.
productionTier 1 of 4cryo_compression_assembly_line
Stats
CategoryProduction
Level1
Build Cost480,000 cr
Build Time160 ticks
Labor Cost11
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cryo Compression Assembly Linethis tier | 480,000 | 160 | 11 | 1 | 1 | 5 |
| L2 | Gas Compression Upgrade Center | 1,570,000 | 250 | 22 | 2 | 1 | 6 |
| L3 | Industrial Gas Collection Complex | 4,478,000 | 330 | 39 | 4 | 1 | 7 |
| L4 | Quantum Compression Nexus | 13,663,000 | 410 | 55 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.