Cryo-Transport Manufacturing
An integrated facility combining storage unit assembly, coolant loop pressurization, and circuit board installation on a single conveyor system. Sensor arrays verify proper suspension fluid distribution at each stage.
productionTier 2 of 4cryo_transport_manufacturing
Stats
CategoryProduction
Level2
Build Cost356,000 cr
Build Time250 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Suspension Pod Assembly | 132,000 | 170 | 8 | 1 | 1 | 3 |
| L2 | Cryo-Transport Manufacturingthis tier | 356,000 | 250 | 16 | 2 | 1 | 6 |
| L3 | Automated Suspension Pod Factory | 1,176,000 | 330 | 28 | 4 | 1 | 7 |
| L4 | Next-Generation Cryo-Pod Line | 3,531,000 | 420 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.