Cryogenic Production Vault
Heavy-duty manufacturing complex with precision-optic-guided chamber assembly and cryogenic-loop integration. Combines liquid-nitrogen systems, durasteel construction, and circuit integration in a 33-second production cycle.
productionTier 3 of 4cryogenic_production_vault
Stats
CategoryProduction
Level3
Build Cost2,043,000 cr
Build Time410 ticks
Labor Cost49
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Freeze Chamber | 216,000 | 200 | 14 | 1 | 1 | 5 |
| L2 | Cryo-Sleep Assembly | 661,000 | 310 | 28 | 2 | 1 | 6 |
| L3 | Cryogenic Production Vaultthis tier | 2,043,000 | 410 | 49 | 4 | 1 | 7 |
| L4 | Temporal Hibernation Works | 5,967,000 | 510 | 70 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.