Cutting-Edge Phase Drive Factory
Fully automated precision facility with shield emitters and extensive coolant infrastructure managing the extreme thermal and exotic-matter demands. Produces phase drives at peak efficiency with real-time dimensional validation.
productionTier 4 of 4cutting_edge_phase_drive_factory
Stats
CategoryProduction
Level4
Build Cost16,815,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Build Voidborn Phase DriveShipbuilding
90 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Phase Drive Assembly Plant | 599,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Dimensional Propulsion Works | 1,757,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Phase Propulsion Manufacturing Line | 5,415,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Cutting-Edge Phase Drive Factorythis tier | 16,815,000 | 420 | 200 | 6 | 1 | 9 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.