Cutting-Edge Quantum Factory
State-of-the-art manufacturing complex employing full quantum-grade control systems, precision optical alignment, and fully integrated automated workflows for superconductor bonding and core assembly. Produces exotic processors at industrial scale.
productionTier 4 of 4cutting_edge_quantum_factory
Stats
CategoryProduction
Level4
Build Cost16,156,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Fabricate Quantum ProcessorComponents
120 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Quantum Processor Assembly Line | 586,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Advanced Processor Plant | 1,800,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Quantum Manufacturing Works | 5,409,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Cutting-Edge Quantum Factorythis tier | 16,156,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.