Elite Accommodations Manufacturing Complex
Industrial production integrating quantum control systems, enhanced sensor arrays, and precision optics for panoramic displays. Reinforced frames and expanded processing cores enable simultaneous fabrication of multiple suites with exacting interior specifications.
productionTier 3 of 4elite_accommodations_manufacturing_complex
Stats
CategoryProduction
Level3
Build Cost11,370,000 cr
Build Time330 ticks
Labor Cost140
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Luxury Stateroom Fabrication Unit | 1,351,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | High-End Passenger Assembly Plant | 3,911,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Elite Accommodations Manufacturing Complexthis tier | 11,370,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Bespoke Stateroom Production Facility | 33,127,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.