Em Hull Hardener Assembly Plant
Mass-production equipment with quantum control cores driving automated shield matrix assembly and coolant-assisted superconductor bonding. Modular staging allows continuous feed of prepared hull sections through the integration chamber.
productionTier 3 of 4em_hull_hardener_assembly_plant
Stats
CategoryProduction
Level3
Build Cost1,448,000 cr
Build Time220 ticks
Labor Cost25
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Em Hull Hardener Workshop | 133,000 | 110 | 7 | 1 | 1 | 5 |
| L2 | Em Hull Hardener Production Lab | 491,000 | 170 | 14 | 2 | 1 | 6 |
| L3 | Em Hull Hardener Assembly Plantthis tier | 1,448,000 | 220 | 25 | 4 | 1 | 7 |
| L4 | Em Hull Hardener Fabrication Nexus | 4,119,000 | 280 | 35 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.