Emergency Warp Stabilizer Production Lab
Larger-scale facility with dedicated assembly stations for coil winding, quantum stabilizer integration, and containment chamber fabrication. Output increased to one unit per 16 minutes through parallel processing.
productionTier 2 of 4emergency_warp_stabilizer_production_lab
Stats
CategoryProduction
Level2
Build Cost4,227,000 cr
Build Time140 ticks
Labor Cost12
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Emergency Warp Stabilizer Workshop | 1,268,000 | 100 | 6 | 1 | 1 | 5 |
| L2 | Emergency Warp Stabilizer Production Labthis tier | 4,227,000 | 140 | 12 | 2 | 1 | 6 |
| L3 | Emergency Warp Stabilizer Assembly Facility | 12,032,000 | 190 | 21 | 4 | 1 | 7 |
| L4 | Emergency Warp Stabilizer Technology Nexus | 35,492,000 | 240 | 30 | 6 | 1 | 9 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.