Focused EM Manufactory
Industrial-scale manufacturing with quantum control cores managing resonance tuning and energy-density optimization. Targeting computers verify each charge pack's electromagnetic profile and power output.
productionTier 3 of 4focused_em_manufactory
Stats
CategoryProduction
Level3
Build Cost1,157,000 cr
Build Time300 ticks
Labor Cost52
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Focused EM Press | 143,000 | 180 | 15 | 1 | 1 | 3 |
| L2 | Focused EM Factory | 428,000 | 240 | 30 | 2 | 1 | 6 |
| L3 | Focused EM Manufactorythis tier | 1,157,000 | 300 | 52 | 4 | 1 | 7 |
| L4 | Focused EM Ordnance Complex | 3,774,000 | 360 | 75 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.