Frost Mining Facility
Integrated facility with multiple assembly stations, processing-core integration, and sensor-array calibration producing ice-harvester units at higher rates.
productionTier 2 of 4frost_mining_facility
Stats
CategoryProduction
Level2
Build Cost354,000 cr
Build Time190 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Ice Cutter Station | 130,000 | 130 | 8 | 1 | 1 | 3 |
| L2 | Frost Mining Facilitythis tier | 354,000 | 190 | 16 | 2 | 1 | 6 |
| L3 | Cryogenic Extraction Plant | 1,068,000 | 250 | 28 | 4 | 1 | 7 |
| L4 | Advanced Cryogenic Hub | 3,404,000 | 320 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.