Fuel Tank Integration Line
A dedicated production facility for assembling pressurized fuel bladder systems. Handles flex-polymer sealing, aluminum sheet fabrication, and structural bolt-down procedures in a steady industrial process.
productionTier 1 of 4fuel_tank_integration_line
Stats
CategoryProduction
Level1
Build Cost132,000 cr
Build Time170 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Fuel Tank Integration Linethis tier | 132,000 | 170 | 10 | 1 | 1 | 3 |
| L2 | Pressurized Tank Assembly Plant | 447,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Fuel Tank Production Works | 1,302,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Automated Fuel Systems Foundry | 3,888,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.