Guidance Assembly Line
Purpose-built production line that integrates circuit boards, sensor arrays, and polymer housings into targeting systems. Steady-state operation produces completed guidance units at regular intervals.
productionTier 1 of 4guidance_assembly_line
Stats
CategoryProduction
Level1
Build Cost138,000 cr
Build Time150 ticks
Labor Cost12
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Guidance Assembly Linethis tier | 138,000 | 150 | 12 | 1 | 1 | 3 |
| L2 | Guidance Unit Plant | 393,000 | 210 | 24 | 2 | 1 | 6 |
| L3 | Guidance Unit Facility | 1,251,000 | 270 | 42 | 4 | 1 | 7 |
| L4 | Guidance Unit Hub | 3,775,000 | 330 | 60 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.