High-Capacity Coolant Refinery
Industrial-scale production with extensive heat sink arrays and cryogenic containment. Reinforced pressure vessels handle the intense thermal cycling while automated plasma injectors precisely regulate nitrogen addition rates for consistent fluid synthesis.
productionTier 3 of 4high_capacity_coolant_refinery
Stats
CategoryProduction
Level3
Build Cost958,000 cr
Build Time330 ticks
Labor Cost18
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Coolant Blending Line | 99,000 | 170 | 5 | 1 | 1 | 3 |
| L2 | Cryogenic Coolant Plant | 328,000 | 250 | 10 | 2 | 1 | 6 |
| L3 | High-Capacity Coolant Refinerythis tier | 958,000 | 330 | 18 | 4 | 1 | 7 |
| L4 | Automated Cryogenic Synthesis Complex | 2,990,000 | 420 | 25 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.