High-Volume Mine Production Factory
Industrial-scale weapons facility with quantum targeting computers and parallel assembly lines orchestrating rapid mine production. Automated precision systems maintain detonation reliability at high output rates.
productionTier 3 of 4high_volume_mine_production_factory
Stats
CategoryProduction
Level3
Build Cost861,000 cr
Build Time330 ticks
Labor Cost28
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Mine Assembly Line | 122,000 | 110 | 7 | 1 | 1 | 3 |
| L2 | Automated Mine Manufacturing Plant | 302,000 | 250 | 16 | 2 | 1 | 6 |
| L3 | High-Volume Mine Production Factorythis tier | 861,000 | 330 | 28 | 4 | 1 | 7 |
| L4 | Quantum Mine Manufacturing Complex | 2,832,000 | 420 | 40 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.