Industrial Cryo Works
High-throughput cryogenic facility with expanded refrigeration capacity and structural reinforcement for sustained production. Integrated control systems manage multi-stage cooling and component assembly at scale.
productionTier 2 of 4industrial_cryo_works
Stats
CategoryProduction
Level2
Build Cost2,548,000 cr
Build Time250 ticks
Labor Cost80
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cryo-Extraction Plant | 891,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Industrial Cryo Worksthis tier | 2,548,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Automated Cryo-Refinery | 7,786,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Cryo-Extraction Megaline | 23,689,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.