Industrial Extraction Platform
Advanced automated facility integrating quantum-controlled laser-focus alignment, precision targeting-computer calibration, and reinforced-frame assembly to achieve significant production acceleration.
productionTier 3 of 4industrial_extraction_platform
Stats
CategoryProduction
Level3
Build Cost14,348,000 cr
Build Time360 ticks
Labor Cost46
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Mining Laser Assembly Line | 1,569,000 | 180 | 13 | 1 | 1 | 5 |
| L2 | Multi-Beam Mining Station | 4,617,000 | 270 | 26 | 2 | 1 | 6 |
| L3 | Industrial Extraction Platformthis tier | 14,348,000 | 360 | 46 | 4 | 1 | 7 |
| L4 | Hyperdensity Extraction Complex | 40,932,000 | 450 | 65 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.