Industrial Lounge Manufacturing Complex
Heavy-duty plant with precision optics guiding trim and cabinetry assembly, quantum control cores managing ambience and beverage-service integration across multiple lounges. Reinforced construction supports continuous five-minute output.
productionTier 3 of 4industrial_lounge_manufacturing_complex
Stats
CategoryProduction
Level3
Build Cost10,900,000 cr
Build Time330 ticks
Labor Cost140
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Lounge Fitting Bay | 1,250,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Automated Lounge Assembly Plant | 3,680,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Industrial Lounge Manufacturing Complexthis tier | 10,900,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Advanced Hospitality Module Production | 31,900,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.