Industrial Ore Processing Complex
Heavy industrial facility with quantum control cores orchestrating precision superconductor placement and durasteel frame construction. Multiple processing stations achieve two-minute cycle times for complete refinery units.
productionTier 3 of 4industrial_ore_processing_complex
Stats
CategoryProduction
Level3
Build Cost5,256,000 cr
Build Time330 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Ore Separation Assembly | 590,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Automated Mineral Refinery Plant | 1,672,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Industrial Ore Processing Complexthis tier | 5,256,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Advanced Electromagnetic Refinery Production | 14,943,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.