Industrial Quantum Fabrication
Heavy-duty production line with reinforced frames supporting cryogenic coolant loops that maintain quantum coherence during core assembly. Advanced control nodes manage the quantum entanglement binding process at scale.
productionTier 3 of 4industrial_quantum_fabrication
Stats
CategoryProduction
Level3
Build Cost3,198,000 cr
Build Time330 ticks
Labor Cost56
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Assemble Quantum Control CoreFacility Construction
54 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Quantum Control Node Assembly | 361,000 | 170 | 16 | 1 | 1 | 4 |
| L2 | Quantum Coordination Plant | 1,070,000 | 250 | 32 | 2 | 1 | 5 |
| L3 | Industrial Quantum Fabricationthis tier | 3,198,000 | 330 | 56 | 4 | 1 | 5 |
| L4 | Quantum Core Synthesis Center | 9,864,000 | 420 | 80 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.