Integrated Medical Works
Large-scale medical module manufacturing with reinforced atmospheric containment and advanced life-support unit integration. Produces fully functional crew treatment facilities at industrial scale.
productionTier 3 of 4integrated_medical_works
Stats
CategoryProduction
Level3
Build Cost1,385,000 cr
Build Time330 ticks
Labor Cost42
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Medical Module Assembly Line | 137,000 | 170 | 12 | 1 | 1 | 3 |
| L2 | Medical Systems Plant | 423,000 | 250 | 24 | 2 | 1 | 6 |
| L3 | Integrated Medical Worksthis tier | 1,385,000 | 330 | 42 | 4 | 1 | 7 |
| L4 | Advanced Medical Bay Factory | 4,052,000 | 420 | 60 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.