Isotope Separator Production Complex
Industrial-scale radiation-containment facility with heavy lead shielding, hazmat-container integration, and dual-gradient thermal processing in series for high-throughput isotope separation.
productionTier 3 of 4isotope_separator_production_complex
Stats
CategoryProduction
Level3
Build Cost5,600,000 cr
Build Time330 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Isotope Separator Assembly Plant | 646,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Automated Isotope Separation Plant | 1,877,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Isotope Separator Production Complexthis tier | 5,600,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Isotope Separator Manufacturing Foundry | 17,774,000 | 420 | 50 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.