Kinetic Hull Hardener Assembly Plant
Industrial manufacturing with reinforced frame assembly and integrated shield emitter systems. Delivers high-performance hardeners with quantum-controlled material density optimization and cryogenic processing.
productionTier 3 of 4kinetic_hull_hardener_assembly_plant
Stats
CategoryProduction
Level3
Build Cost1,114,000 cr
Build Time220 ticks
Labor Cost25
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Kinetic Hull Hardener Workshop | 125,000 | 110 | 7 | 1 | 1 | 3 |
| L2 | Kinetic Hull Hardener Production Lab | 395,000 | 170 | 14 | 2 | 1 | 6 |
| L3 | Kinetic Hull Hardener Assembly Plantthis tier | 1,114,000 | 220 | 25 | 4 | 1 | 7 |
| L4 | Kinetic Hull Hardener Fabrication Nexus | 3,440,000 | 280 | 35 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.