Low Enriched Uranium Containment Vat
Purpose-built shielding and containerization system for low-enriched uranium. Integrates lead-lined cask assembly with radiation-hardened control systems to safely package enriched material for transport.
productionTier 1low_enriched_uranium_containment_vat
Stats
CategoryProduction
Level1
Build Cost828,000 cr
Build Time110 ticks
Labor Cost8
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Wrap Low Enriched UraniumRefining
124.5 ticks · Facility only
Upgrade Chain
Low Enriched Uranium Containment Vat has no upgrade path — it is built once, at this level.