Mining Intelligence Nexus
State-of-the-art facility with redundant production channels and advanced thermal management. Extensive reinforced framing and coolant loops allow near-continuous probe delivery at peak efficiency.
productionTier 4 of 4mining_intelligence_nexus
Stats
CategoryProduction
Level4
Build Cost3,419,000 cr
Build Time290 ticks
Labor Cost40
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Probe Assembly Line | 126,000 | 120 | 8 | 1 | 1 | 3 |
| L2 | Mining Survey Lab | 377,000 | 170 | 16 | 2 | 1 | 5 |
| L3 | Mineral Analysis Plant | 1,109,000 | 230 | 28 | 4 | 1 | 5 |
| L4 | Mining Intelligence Nexusthis tier | 3,419,000 | 290 | 40 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.