Modular Hangar Bay Production Plant
An expanded facility with parallel hull plating stations, dedicated docking ring installation, and structural frame integration. Improved workflow and material staging enable faster assembly of these substantial ship-storage modules.
productionTier 2 of 4modular_hangar_bay_production_plant
Stats
CategoryProduction
Level2
Build Cost2,858,000 cr
Build Time250 ticks
Labor Cost80
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Hangar Bay Module Assembly Line | 967,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Modular Hangar Bay Production Plantthis tier | 2,858,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Automated Hangar Bay Works | 9,077,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | State-of-the-Art Hangar Bay Fabrication Complex | 27,386,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.