Nanocarbon Manufacturing Complex
State-of-the-art facility with quantum-core composite alignment, advanced reinforced framing, and precision coolant management enabling rapid production of elite nanocarbon lattice at maximum throughput.
productionTier 4 of 4nanocarbon_manufacturing_complex
Stats
CategoryProduction
Level4
Build Cost7,140,000 cr
Build Time420 ticks
Labor Cost140
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Carbon Weave Assembly Line | 241,000 | 170 | 28 | 1 | 1 | 5 |
| L2 | Nanocarbon Fabrication Plant | 866,000 | 250 | 56 | 2 | 1 | 6 |
| L3 | Advanced Composite Works | 2,399,000 | 330 | 98 | 4 | 1 | 7 |
| L4 | Nanocarbon Manufacturing Complexthis tier | 7,140,000 | 420 | 140 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.