Neon Signal Workshop
Expanded facility with parallel ionization chambers and integrated circuit-board attachment stations. Processing cores optimize gas ionization rates and sensor arrays verify tube brightness and frequency response in real time.
productionTier 2 of 4neon_signal_workshop
Stats
CategoryProduction
Level2
Build Cost326,000 cr
Build Time170 ticks
Labor Cost14
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Neon Tube Assembler | 106,000 | 110 | 7 | 1 | 1 | 3 |
| L2 | Neon Signal Workshopthis tier | 326,000 | 170 | 14 | 2 | 1 | 6 |
| L3 | Neon Signal Array Plant | 898,000 | 220 | 25 | 4 | 1 | 7 |
| L4 | Neon Signal Fabrication Complex | 2,831,000 | 280 | 35 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.