Nuclear Manufacturing Plant
Industrial-scale reactor production leveraging quantum control cores and precision optics for advanced fuel rod geometry and containment-field optimization. Continuous monitoring ensures each unit meets exacting power-output specs.
productionTier 3 of 4nuclear_manufacturing_plant
Stats
CategoryProduction
Level3
Build Cost16,712,000 cr
Build Time540 ticks
Labor Cost67
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Build Station ReactorComponents
555 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Fission Assembly | 1,648,000 | 270 | 19 | 1 | 1 | 5 |
| L2 | Reactor Engineering Works | 5,179,000 | 410 | 38 | 2 | 1 | 6 |
| L3 | Nuclear Manufacturing Plantthis tier | 16,712,000 | 540 | 67 | 4 | 1 | 7 |
| L4 | Stellar Power Generation Complex | 45,946,000 | 680 | 95 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.