Ordnance Manufacturing Plant
Specialized industrial facility with integrated ammunition fabrication and barrel-assembly staging. Reduces cycle time to 2 minutes through parallel weapon-core preparation and targeting-computer calibration.
productionTier 2 of 4ordnance_manufacturing_plant
Stats
CategoryProduction
Level2
Build Cost859,000 cr
Build Time250 ticks
Labor Cost58
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Weapon Bay Assembly Line | 301,000 | 170 | 29 | 1 | 1 | 5 |
| L2 | Ordnance Manufacturing Plantthis tier | 859,000 | 250 | 58 | 2 | 1 | 6 |
| L3 | Advanced Weapons Assembly Complex | 2,654,000 | 330 | 102 | 4 | 1 | 7 |
| L4 | Automated Ordnance Production System | 7,282,000 | 420 | 145 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.