Platinum Contact Production Plant
An expanded plant with automated contact winding and thermal management for dense circuitry packing, assembling platinum-contact control nodes at steady volume.
productionTier 2 of 4platinum_contact_production_plant
Stats
CategoryProduction
Level2
Build Cost340,000 cr
Build Time230 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Assemble Platinum Control NodeFacility Construction
9 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Platinum Contact Assembly Line | 110,000 | 150 | 8 | 1 | 1 | 4 |
| L2 | Platinum Contact Production Plantthis tier | 340,000 | 230 | 16 | 2 | 1 | 6 |
| L3 | Platinum Automation Works | 1,050,000 | 310 | 28 | 4 | 1 | 7 |
| L4 | Noble Contact Control Works | 3,200,000 | 400 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.